Connecting after UPS cable from the panel side
|
Apply LOTO in this part of installation to avoid electrical shock hazard. |
|
Apply Zero energy verification before start connection to power distribution box (PDB). |
- Connect one end of the three cores cable as follows:
- Connect one terminal to the UPS circuit breaker
- Make sure that there is no voltage between neutral and earth
- Connect the neutral wire to the Rosetta of neutral or bar of neutral at the site panel
- Connect the earth wire to the earth bar in the site panel
- Check the needed length of the cable to connect between the site panel and Inspector device