Inspector™ InstallationHardware Configurations Single Phase Connection Earth, Neutral, UPS and Mains Wiring Connecting after UPS cable from the panel side Connecting Mains cable from the panel side Connecting UPS and mains cables from Inspector side Line to Neutral connection (L-N)