Connecting UPS and mains cables from Inspector side
|
Apply LOTO in this part of installation to avoid electrical shock hazard. |
|
Apply Zero energy verification before start connection to power distribution box (PDB). |
At Inspector side, you will have to check that all of short connections are fixed on their proper places. You have two connection options: “Line to Neutral” or “Line to Line”.
In Single Phase Connection You Must Select “Line to Neutral” Option. You can find the connection guide under the cover of Inspector as shown.
|
Line to Neutral connection is used in SINGLE/THREE PHASE CONNECTION, BUT Line to Line is ONLY used in THREE PHASE CONNECTION. |