Free engineering tool

Voltage sag ride-through checker
against ITIC and SEMI F47.

Enter the residual voltage and duration of any dip, swell or interruption. See its IEEE 1159 class and whether your equipment should have ridden through it.

Events

#Residual voltageDurationUnit

Where each event falls

Solid line: ITIC tolerance envelope. Dashed line: SEMI F47 required ride-through. Green: inside ITIC. Red: outside.
#EventIEEE 1159 classITICSEMI F47
You can only check an event you recorded. Inspector logs every dip, swell and interruption 24/7 with 5 cycles of waveform before and after, and alerts you as it happens.Talk to an engineer

What the checker tells you

For each event you enter (residual voltage and duration), the checker returns three answers:

  1. The IEEE 1159 class: sag, swell or interruption, and whether it was instantaneous, momentary or temporary.
  2. ITIC: whether the event was inside the tolerance envelope that typical information-technology and control equipment is expected to survive.
  3. SEMI F47: whether equipment built to the semiconductor-industry immunity requirement should have ridden through it.

Use it after a trip: take the event from your power quality recorder, enter it, and see whether the supply or the equipment is the weak link.

The ITIC (CBEMA) curve

The ITIC curve, published by the Information Technology Industry Council, replaced the older CBEMA curve in 1996. It describes the voltage events that typical IT equipment at 120 V should tolerate:

DurationEquipment should tolerate a residual voltage down toAnd swells up to
Up to 20 ms0 % (a complete dropout)120 % after the first half cycle
20 ms to 0.5 s70 %120 %
0.5 s to 10 s80 %110 %
Longer than 10 s90 %110 %

Sources: Power Monitors, CBEMA and ITIC curves, PG&E, Voltage Tolerance.

The curve is a reference for what equipment should survive, not a design specification for the supply. Industrial drives, contactors and PLC power supplies are often less tolerant than the curve suggests, which is exactly why an event inside the envelope can still stop a line.

SEMI F47

SEMI F47 is the voltage sag immunity specification for semiconductor processing, metrology and test equipment. It is widely used beyond semiconductors as a benchmark for industrial control equipment. Equipment must continue operating without interruption through sags to:

Residual voltageDuration at 50 HzDuration at 60 Hz
50 %200 ms (10 cycles)200 ms (12 cycles)
70 %500 ms (25 cycles)500 ms (30 cycles)
80 %1 s (50 cycles)1 s (60 cycles)

Source: Advanced Energy application note AN1401 on SEMI F47-0706. The specification covers sags only, not swells or interruptions.

Reading the result

  • Inside ITIC and the equipment tripped: the equipment, or a component inside it, is less tolerant than it should be. Typical fixes are ride-through settings on drives, a small UPS or DC supply for control circuits, or contactor coil hold-in devices.
  • Outside ITIC: the event was severe enough that ordinary equipment is not expected to survive. The fix is on the supply side: ride-through equipment such as a UPS or dynamic voltage restorer, or a discussion with the utility about the fault behind the dip.
  • Below the SEMI F47 requirement: compliant equipment is not required to survive this event either.

Our guide on voltage dip vs sag vs interruption explains the definitions behind the classes, and voltage sags and production stops explains how to link events to stoppages.

Frequently asked questions

Is “residual voltage” the same as the depth of the sag?
No. Residual voltage is what remained (a sag to 70 %). Depth is how far it fell (a 30 % sag). This checker uses residual voltage, as IEC instruments report it.

Can I use the ITIC curve at 230 V or 400 V?
The curve was written for 120 V equipment, but in percent of nominal it is widely used as a reference at other voltages. Treat it as a guide, and use the equipment’s own immunity data when you have it.

Why does a 100 ms event matter for a process that takes hours?
Because a contactor, drive or controller that drops out in 100 ms stops the process, and restarting it can take hours. The event is short; the cost is not.

Want every event recorded and plotted automatically? Talk to an Inspector engineer.